Outdoor / Exterior

Fukuoka 208 No. Okinohata viaduct floorboards outside construction (Fukuoka Yanagawa)Construction Date: June 2016 treated region: RC plane (wheel guard wall railings side) [TPX microfilm method] has been adopted!

Road Station Ukiha toilet renovation (Fukuoka Prefecture Ukiha)
Construction date: 2016 March
treated region: painted surfaces, wood surfaces, glass surfaces, aluminum surface-silicate calcium plate surface [TPX microfilm method] has been adopted!

Hirao Clinic (Hiroshima, Hiroshima Prefecture)Construction Date: 2015 November construction place: glass surface

Sakai plumage Gakuen’naka high-Phase 1 (Osaka Takaishi)
Construction date: 2015 February to March treated region: RC plane

Hiroshimashin’yokinko Iguchi Training Center (Hiroshima, Hiroshima Prefecture)
Construction date: 2015 January treated region: painted surfaces, glass surfaces

Kagoshima City Hospital this building (Kagoshima, Kagoshima Prefecture)
Construction Date: November 2014 to 2015 February-treated region: paintwork tile surface and glass surface

Kikuyo-machi light forest complex of (Kumamoto Prefecture Kikuchi-gun)
Construction Date: September 2014 to November
treated region: RC plane glass surface